Skip to Main Content

Error message

  • Notice: Undefined index: items in Drupal\ramsa_api\Api\UserApi::populateProjectData() (line 1120 of modules/custom/ramsa_api/src/Api/UserApi.php).
  • Warning: Invalid argument supplied for foreach() in Drupal\ramsa_api\Api\UserApi::populateProjectData() (line 1120 of modules/custom/ramsa_api/src/Api/UserApi.php).
  • Warning: array_chunk(): Size parameter expected to be greater than 0 in Drupal\ramsa_api\Api\UserApi::populateProjectData() (line 1130 of modules/custom/ramsa_api/src/Api/UserApi.php).

Shoenecker Center STEAM Building

The Schoenecker Center, a new five-story Science, Technology, Engineering, Arts and Mathematics (STEAM) building at the University of St. Thomas, is a 120,000-square-foot facility that connects to and includes the renovation of the existing 140,000-square-foot O’Shaughnessy Science Hall. The project is designed to support a second phase of construction that will house the University’s School of Allied Health Professions. The new center houses a wide variety of academic spaces for STEM and fine/performing arts students, including: engineering and robotics labs, a newsroom, instrumental rehearsal and storage spaces, choral performance spaces and art galleries, in addition to offices and e-media classrooms. Public spaces include an atrium, a café, and various other interdisciplinary collaboration and social spaces.

One Park Avenue, New York, NY 10016 +1 212-967-5100
Robert A.M. Stern Architects © 2024. All rights reserved.